por yoyo | Sep 15, 2026 | Trituradoras
This is the question behind half the emails I get from plant managers. “We run film offcuts, some thick-walled reject parts, a bit of pipe, and purge blocks from changeovers. Do we need a different shredder for each one?” The short answer is almost always... por yoyo | Sep 15, 2026 | Trituradoras
Walk into almost any injection molding shop and there’s a corner where the purge lumps live. Startup purges from changeovers, color-change blocks, off-spec parts, the occasional solid lump the size of a shoe box. Somebody wheels a bin out there every week and it... por yoyo | Sep 14, 2026 | Trituradoras
Somebody walks past the shredder, hears a change in pitch, and pulls the logbook. Last blade change: eleven weeks ago. On paper, that’s fine. The manual says rotate the blades every 300 hours, and they’re at 280. Then they open the chamber and find half... por yoyo | Sep 8, 2026 | Trituradoras
There are three kinds of shredder buyers I meet. The first watched a video of a single shaft shredder eating a plastic pallet whole and decided that’s what they need. Doesn’t matter what they’re shredding. They want that machine. The second already... por yoyo | 3 de septiembre de 2026 | Trituradoras
Cada trituradora viene con una cifra de capacidad. «2.000 kg/h». «5 toneladas por hora». Queda muy bien en el folleto. Pero luego la incorporas a tu línea de producción, le echas material de verdad y, a lo sumo, alcanza unas 60% de esa cifra. A veces, incluso menos. Nadie te advirtió que el...